PDA

View Full Version : VPP with Charges



Alcamtar
Oct 5th, '03, 02:25 PM
If a VPP was purchased with 16 Charges (-0) on the control cost, would that mean that the entire pool is usable 16 times per day, or would it mean that each power in the pool must take the 16 Charges limitation, or would it mean that the pool can only be changed 16 times per day? Also, would Charges on the pool mean that all powers in the pool have no END cost?

Thanks,
Mike

Steve Long
Oct 5th, '03, 03:50 PM
It would work the same way it does with a Multipower — the entire VPP can only be used 16 times per day, and those 16 uses (whatever they might be) wouldn’t cost END.